
Express Business Hotel
22–28㎡ · Efficiency · batch · consistency
¥18,000–¥28,000 / roomUBI HOSPITALITY SOLUTIONS · CHINA SUPPLY CHAIN
From room concept and furniture to soft furnishings, lighting and core bathroom products—build a replaceable, quote-ready guest-room package.
START WITH POSITIONING
Each scheme connects the room scenario, product package, material direction and reference price basis for earlier project decisions.

22–28㎡ · Efficiency · batch · consistency
¥18,000–¥28,000 / room
25–32㎡ · Quality · comfort · durability
¥28,000–¥42,000 / room
30–38㎡ · Design · consistency · longevity
¥42,000–¥65,000 / room
38–50㎡ · Material · detail · coordination
¥65,000–¥100,000 / room
30–45㎡ · Culture · scenario · custom
¥50,000–¥120,000 / room
38–60㎡ · Nature · stay · outdoors
¥50,000–¥120,000 / room
32–55㎡ · Storage · kitchen · extended stay
¥30,000–¥80,000 / room
28–45㎡ · Style · material · experience
¥30,000–¥100,000 / room
50–120㎡ · Suite · detailing · custom
Project based
ONE BUDGET, DIFFERENT RESULTS
The budget stays locked. Switching style only rotates options from the same budget pool—it never crosses budgets.

A balanced guest-room package combining durable finishes and a calm business atmosphere.
Wood finish · contract textilePRODUCT SWAPS
Options remain within the selected room scope and budget tier; incompatible combinations are excluded.
Product hotspots
Included in the selected purchase scope · 24 product lines
SUPPLY NETWORK & PRODUCTION
Public partner counts are published only after qualification, capacity, quality and authorization review. Each project tracks its specialist scope, mock-up, production plan and inspection responsibility.
BOM, specifications, fire rating and finish samples
Cutting, edging, CNC, joinery and trial assembly
Veneer, coating, upholstery, metal and stone coordination
Functional checks, appearance inspection, pre-installation, protection and consolidation
CASE DISCLOSURE PRINCIPLES
Case pages organize project positioning, supply scope, room quantity, material system and delivery milestones. They never present partner material or unauthorized projects as UBI-owned work.
Only projects in which UBI participated and has confirmed permission to disclose.
Partner reference projects with authorization and role clearly stated.
For discussing style, materials and function—never an implied supply relationship.
Clearly marked as a concept, never presented as a delivered project.
SUPPLY CAPABILITY
Build an executable package from room type, budget and purchase scope.
Coordinate joinery, loose furniture, upholstery, lighting and bathroom products.
Support material approval, mock-up rooms, volume manufacturing and quality control.
Consolidation, packaging, logistics and installation support.
BRING THE SCHEME INTO YOUR PROJECT
Share a BOQ, plan, rendering or current proposal for a more accurate product package, price basis and lead-time advice.